AP1000 RPV Closure Head Forging
-
Payment
-
Origin
China Mainland
-
Minimum Order
10
-
Packing
Pieces
- Contact Now Start Order
- Description
Product Detail
The AP1000 design, using PRA analysis to identify weaknesses in the design and improvement, improve the level of safety. AP1000 considering the probability of reactor core melting of internal events and the probability of radioactive releases and 5.9x10-8/years 5.1x10-7/years respectively, far less than the second generation of 1x10-5/and 1x10-6/heap level.
- AP1000 Core Barrel 10 Pieces / (Min. Order)
- AP1000 Primary Coolant Pipe 10 Pieces / (Min. Order)
- AP1000 Steam Generator Core Barrel Forging 10 Pieces / (Min. Order)
- AP1000 Steam Generator Ellipsoidal Head Forging 10 Pieces / (Min. Order)
- AP1000 Pressurizer Closure Head Forging 10 Pieces / (Min. Order)
- AP1000 Transition Section 10 Pieces / (Min. Order)
- AP1000 RPV Nozzle (RV Nozzle) 10 Pieces / (Min. Order)
- 1000MW Low Pressure Rotor 10 Pieces / (Min. Order)
- 580t Steel Ingot 10 Pieces / (Min. Order)