1000MW Low Pressure Rotor
-
Payment
-
Origin
China Mainland
-
Minimum Order
10
-
Packing
Pieces
- Contact Now Start Order
- Description
Product Detail
Rotor due to difficulties, high speed, fault-prone. Common failures have damaged commutator, bearings damage, wind damage, and brush wear, rotor windings burned, and so on.
- AP1000 Core Barrel 10 Pieces / (Min. Order)
- AP1000 Primary Coolant Pipe 10 Pieces / (Min. Order)
- AP1000 Steam Generator Core Barrel Forging 10 Pieces / (Min. Order)
- AP1000 Steam Generator Ellipsoidal Head Forging 10 Pieces / (Min. Order)
- AP1000 RPV Closure Head Forging 10 Pieces / (Min. Order)
- AP1000 Pressurizer Closure Head Forging 10 Pieces / (Min. Order)
- AP1000 Transition Section 10 Pieces / (Min. Order)
- AP1000 RPV Nozzle (RV Nozzle) 10 Pieces / (Min. Order)
- 580t Steel Ingot 10 Pieces / (Min. Order)